Co-location / Data Center


The Data Center Complex was built on land of approximately 40,000 m², almost triangular in shape, bounded by the main access roads to the Agricultural Park Granja do Torto and the secondary route designed for access to the lot, which will be out by area extension Green institutionally defined by the Federal District Government.
The project, prepared for this Datacenter, defines a total floor area equivalent to 24,013.69 m², consisting, in general, four buildings, functionally distinct natures to each other.
Structure of the buildings: the main structural parts of the blocks were executed in prestressed concrete (slab, beams, columns, walls). The structure of all the blocks presented fire protection in order to ensure the stability of the construction by at least 4 (four) hours, as required. Block A
It is building with two floors (ground floor, Floor Technician), with a total area equivalent to 4,492 square meters and overall height of 8.50 m compared to the ground level, intended to house resources (human and material) required for the performance of monitoring activities of "production" environments and IT services, as well as the supervisory activities and monitoring of building infrastructure.
Block B
This building, whose total area is equivalent to 10,255 square meters and height of 13.05 m compared to the ground level, is defined only by two floors and a basement - ground and above - for behaving IT industrial facilities and some equipment infrastructure and security that, for technical constraints, need to be located close to areas of "production". Block C
This block, whose total area amounts to 10,213.22 m², is set over two floors as follows: ground floor, mezzanine (technical floor), first floor. All are designed solely for facilities infrastructure. Block Quarantine
This block, whose total area amounts to 1,584 m², is defined by a ground floor and one floor, namely half of the CEF and the other half of the Bank of Brazil. All will be allocated exclusively to laboratories for quarantine / receiving equipment.