Energy efficiency


The current climate scenario began to demand a greater awareness on the part of society for sustainable and energy-efficient buildings. The regulatory trends moving towards the creation of application of efficient materials and equipment and low energy losses.
 
The data center has unique characteristics of application and operation, and the quest for maximum energy efficiency requires careful planning of strategy, creativity, constant application of high technology, with the reduction of operating cost an added value to your business.
 
The GBT S / A in building the Data Center sought compliance with all national and international current rules, always worrying about the environment, and constant application of investment in improving energy efficiency.
 
Knowledge of Data
 
To comply with green solutions in energy consumption overall knowledge of the building parameters is required.
 
The GBT S / A has a monitoring and integrated automation system with real time record of more than 16,500 points for the overall knowledge of all building data such as:
 
• Energy consumption of the equipment;
• Temperature and humidity of critical environments;
• Power quality data;
• Occupation of critical environments for backlight control;
 
Control
 
With the mapping of the building situation, to an energy efficient operation of the data center requires linear control and real-time equipment.
 
The automation and monitoring system of the building makes it possible to automatically achieve shutdown of idle equipment, reducing the demand for air conditioning equipment due to the thermal demand of the critical environment, automatic shutdown and remote equipment that escape the normal operating parameters.
 
Planning
 
The technical team GBT S / A together with public partners consistently realize the occupancy planning of critical environments seeking uniformity in energy consumption and efficient combat thermal load inside the data center.
 
Integration with partners seek medium and long term actions to make the complex a "green data center".